School’s Kitchen Renovation

Hygiene, health and safety of kitchen team and students are priority for the association since that plays a critical role in the lives of our students. It was for this reason that the kitchen and its auxiliary offices were renovated. 

Below is a breakdown of the work done. 

Kitchen and staff washrooms:

Rebuilt and tiled 

Imported Sinks industrial sinks installed

Electrical

– New wiring for new sockets and oscillating fans also an extractor fan in the kitchen area, 

-Replaced damaged lights switches both the kitchen and staff wash rooms, 

-Extra sockets fixed in Matron’s office.

– Replacement of mosquito mesh on kitchen windows

Terrazzo floor

-Acid wash within the kitchen area.

-Internal open drains repaired and outlet re-diverted in plastic pipe to the open drainage system

– A new grille made for the internal open drain.

– The whole kitchen, staff washrooms and office were repainted

Plumbing

– Kitchen, staff washrooms, showers, etc were repaired and some replaced

0 Comments

Leave a reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

©2019 Mmarima Mma | All Rights Reserved

or

Log in with your credentials

or    

Forgot your details?

or

Create Account